APPLICATION FOR CERTIFICATE OF FINAL ELECTRICAL INSPECTION

External Services

A certificate issued by the building official to Residential, Commercial, and Industrial establishments during the application process for a NEECO Service Meter connection. In accordance with article 1.2.2.2 of the Philippine Electrical Code, it is required that "No electrical installation, alteration, and/or addition shall be connected to any power supply or any other source of electrical energy without a Certificate of Final Electrical Inspection/Completion (DPWH Form No. 96-006-E or as amended) obtained from the appropriate government authority."

← Back

Details

OFFICE/UNIT

OFFICE OF THE MUNICIPAL ENGINEER

CLASSIFICATION

Simple

TYPE OF TRANSACTION

G2C – Government to Citizens

G2B – Government to Business

G2G – Government to Government

WHO MAY AVAIL

Any person, firm, or corporation including government agency or instrumentality within the municipality.

Requirements

# Checklist Item Where to Secure
1 FOR NEWLY CONSTRUCTED/RENOVATED BUILDING/STRUCTURE OR UNIT Below
2 Certificate of Final Electrical Inspection (CFEI) application form with Sketch of location (3 original copy) Owner/Applicant/Contractor.
3 Yellow Card from NEECO (1 original copy) NEECO Business Center
4 Approved Electrical Plan and Permit (1 original copy) Owner/Applicant/Contractor.
5 of As-Built Electrical Plan (1 set, signed and sealed by a Professional Electrical Engineer) Owner/Applicant/Contractor.
6 Certificate of Electrical Completion (3 sets, signed and sealed by Professional Electrical Engineer) (If the construction was undertaken through a contact, the Certificate of Completion shall be signed by the contractor/Authorized Managing Officer) Owner/Applicant/Contractor.
7 Latest PTR and PRC ID of PEE (3 photocopy, signed and sealed) Owner/Applicant/Contractor.
8 One (1) Approved Building Permit (1 original copy) Owner/Applicant/Contractor.
9 Certificate of Occupancy (1 original copy) (If separate application for CFEI) Owner/Applicant/Contractor.
10 PCAB license of Electrical Contractor - for bldg./structure with 200 AT and above Main breaker (1 original copy) Owner/Applicant/Contractor.
11 Insulation Test/Megger Test with Certificate of Calibration of the Equipment used (1 original copy) Owner/Applicant/Contractor.
12 Authorization letter for Representative, with attached photocopy of ID of both the owner and the representative (1 original copy) Owner/Applicant/Contractor.
13 Picture of Building / Structure, Service Entrance and Panel Board Owner/Applicant/Contractor.
14 FOR EXISTING BUILDING/STRUCTURE OR UNIT Below
15 Certificate of Final Electrical Inspection application form with sketch of location (3 original copy) Owner/Applicant/Contractor.
16 Yellow Card from NEECO (1 original copy) NEECO Business Center
17 TCT/Lot Award / NHA Clearance as proof of ownership (1 photocopy) Owner/Applicant/Contractor.
18 Tax Declaration of Land and Building (1 original copy) Owner/Applicant/Contractor.
19 Latest Tax Receipt and Tax Clearance for Land and Building (1 original copy) Owner/Applicant/Contractor.
20 Previously approved Building Permit / Occupancy Permit of the existing building / structure (1 original copy) (for verification purposes only) Owner/Applicant/Contractor.
21 Electrical Plan / Electrical Load Schedule (1 set, signed and sealed by a Professional Electrical Engineer) Owner/Applicant/Contractor.
22 Electrical Plan and Permit for Commercial / Industrial establishment (1 set, signed and sealed by a Professional Electrical Engineer) Owner/Applicant/Contractor.
23 Business Permit for Commercial / Industrial establishment (1 photocopy) Business Permit and Licensing Office
24 Fire Safety Inspection Certificate for Business – for Commercial / Industrial establishment (OBO copy) Municipal Fire Station
25 Barangay Clearance for CFEI application purposes. From Barangay Hall where the house / building / structure is located.
26 Picture of Building / Structure, Service Entrance and Panel Board Owner/Applicant/Contractor.
27 ADDITIONAL REQUIREMENTS IN CASE THE APPLICANT IS NOT THE LAWFUL OWNER OF THE PROPERTY, WHICHEVER IS APPLICABLE Below
28 Contract of Lease / Affidavit of Consent (1 original copy, signed by the property owner or all of the immediate Heirs of the Property Owner and notarized) Owner/Applicant/Contractor.
29 Extra Judicial Settlement (1 original copy, notarized) Owner/Applicant/Contractor.
30 One (1) copy of duly notarized Deed of Absolute Sale Owner/Applicant/Contractor.
31 One (1) copy of duly notarized Deed of Donation Owner/Applicant/Contractor.
32 One (1) copy of Duly Notarized Special Power of Attorney signed by the Property Owner. Owner/Applicant/Contractor.
33 Grant of Right-of-way NEECO Business Center
34 Authorization to process Certificate of Electrical Inspection, with photocopy of ID of both the Owner and the Representative. Owner/Applicant/Contractor.
35 CERTIFICATE OF ELECTRICAL INSPECTION (CEI) REQUIREMENTS FOR TELECOMMUNICATIONS Below
36 Certificate of Final Electrical Inspection application form with sketch of location (1 original copy) Owner/Applicant/Contractor.
37 Yellow Card from NEECO NEECO Business Center
38 TCT / Lot Award / NHA Clearance – for proof of ownership (1 photocopy) Owner/Applicant/Contractor.
39 Tax Declaration of Land and Building (1 photocopy) Owner/Applicant/Contractor.
40 Latest Tax Receipt / Tax Clearance for Land and Building (1 photocopy) Owner/Applicant/Contractor.
41 Contract of Lease (1 photocopy) Owner/Applicant/Contractor.
42 Excavation Permit for Pole Installation (1 photocopy) Owner/Applicant/Contractor.
43 Third-Party Marketing Organization Clearance Owner/Applicant/Contractor.
44 Clearance from Engineering Department Municipal Engineering Office
45 Approved Electrical Permit for Cell Site / Antenna Owner/Applicant/Contractor.
46 Approved Electronics Permit for Cell Site / Antenna Owner/Applicant/Contractor.
47 Certificate of Use Owner/Applicant/Contractor.
48 Picture of Building / Structure, Service Entrance and Panel Board Owner/Applicant/Contractor.
49 Authorization to process CEI, with photocopy of ID of both owner and representative. Owner/Applicant/Contractor.

3 STEPS

CLIENT STEPS

AGENCY ACTION

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

  1. Submit duly accomplished application forms and supporting documents and claim acknowledgement receipt.

1.1 Receive and verify the completeness of application documents in accordance with the provided checklist of requirements.

 

1.2 Encode received application and documents and endorsed to assigned CFEI inspectors for schedule of inspection.

 

1.3 Inspect location of project site;

Prepare inspection report; and

Evaluate documents for compliance.

 

 

 

 

1.4 Final Evaluation of submitted requirements, if found complete and compliant prepare assessment of permit fees.

 

 

1.5 Prepare Order of Payment.

 

 

 

1.6 Sign and approve Order of Payment.

None

 

 

 

 

 

 

 

 

 

 

None

 

 

 

 

 

 

 

 

 

 

None

 

 

 

 

 

 

 

 

 

 

 

 

None

 

 

 

 

 

 

 

 

 

 

 

Refer to NBC (PD1096) prescribed Schedule of Fees

 

None

30 minutes

 

 

 

 

 

 

 

 

 

 

10 minutes

 

 

 

 

 

 

 

 

 

 

2 days

 

 

 

 

 

 

 

 

 

 

 

 

6 hours

 

 

 

 

 

 

 

 

 

 

 

10 minutes

 

 

 

 

 

30 minutes

 

Engr. Ralph Jayson A. Loto
Zoning Officer I

Regino John S. Salamanca
Engineering Assistant

Engineering Office

 

 

 

Engr. Ralph Jayson A. Loto
Zoning Officer I

Regino John S. Salamanca
Engineering Assistant

Engineering Office

 

 

 

Engr. Marlyn L. Laureta
Municipal Engineer

Engr. Ralph Jayson A. Loto
Zoning Officer I

Regino John S. Salamanca
Engineering Assistant

Engineering Office

 

 

Engr. Marlyn L. Laureta
Municipal Engineer

Engr. Ralph Jayson A. Loto
Zoning Officer I

Regino John S. Salamanca
Engineering Assistant

Engineering Office

 

Engr. Ralph Jayson A. Loto
Zoning Officer I

Engineering Office

 

 

Engr. Marlyn L. Laureta
Municipal Engineer

Engr. Ralph Jayson A. Loto
Zoning Officer I

Engineering Office

  1. Claim Order of Payment, Pay Fees to Cashier and Present O.R.

2.1 Check and Record O.R. No.;

Assign Wiring Permit number; and

Prepare CFEI

 

2.2 Approved and Signed Certificate of Final Electrical Inspection

None

 

 

 

 

 

 

 

None

20 minutes

 

 

 

 

 

 

 

10 minutes

Engr. Ralph Jayson A. Loto
Zoning Officer I

Engineering Office

 

 

 

 

Engr. Marlyn L. Laureta
Municipal Engineer

Engr. Ralph Jayson A. Loto
Zoning Officer I

Engineering Office

  1. Claim copy of approved Wiring Permit.

3. Issue copy of Wiring Permit.

None

10 minutes

Engr. Marlyn L. Laureta
Municipal Engineer

Engr. Ralph Jayson A. Loto
Zoning Officer I

Engineering Office

 

TOTAL

Refer to NBC (PD1096) prescribed Schedule of Fees

3 DAYS

 

 

Finish