A certificate issued by the building official to Residential, Commercial, and Industrial establishments during the application process for a NEECO Service Meter connection. In accordance with article 1.2.2.2 of the Philippine Electrical Code, it is required that "No electrical installation, alteration, and/or addition shall be connected to any power supply or any other source of electrical energy without a Certificate of Final Electrical Inspection/Completion (DPWH Form No. 96-006-E or as amended) obtained from the appropriate government authority."
Step 1 of 4
Details
|
OFFICE/UNIT |
OFFICE OF THE MUNICIPAL ENGINEER |
|
CLASSIFICATION |
Simple |
|
TYPE OF TRANSACTION |
G2C – Government to Citizens G2B – Government to Business G2G – Government to Government |
|
WHO MAY AVAIL |
Any person, firm, or corporation including government agency or instrumentality within the municipality. |
Requirements
| # | Checklist Item | Where to Secure |
|---|---|---|
| 1 | ✓FOR NEWLY CONSTRUCTED/RENOVATED BUILDING/STRUCTURE OR UNIT | ●Below |
| 2 | ✓Certificate of Final Electrical Inspection (CFEI) application form with Sketch of location (3 original copy) | ●Owner/Applicant/Contractor. |
| 3 | ✓Yellow Card from NEECO (1 original copy) | ●NEECO Business Center |
| 4 | ✓Approved Electrical Plan and Permit (1 original copy) | ●Owner/Applicant/Contractor. |
| 5 | ✓of As-Built Electrical Plan (1 set, signed and sealed by a Professional Electrical Engineer) | ●Owner/Applicant/Contractor. |
| 6 | ✓Certificate of Electrical Completion (3 sets, signed and sealed by Professional Electrical Engineer) (If the construction was undertaken through a contact, the Certificate of Completion shall be signed by the contractor/Authorized Managing Officer) | ●Owner/Applicant/Contractor. |
| 7 | ✓Latest PTR and PRC ID of PEE (3 photocopy, signed and sealed) | ●Owner/Applicant/Contractor. |
| 8 | ✓One (1) Approved Building Permit (1 original copy) | ●Owner/Applicant/Contractor. |
| 9 | ✓Certificate of Occupancy (1 original copy) (If separate application for CFEI) | ●Owner/Applicant/Contractor. |
| 10 | ✓PCAB license of Electrical Contractor - for bldg./structure with 200 AT and above Main breaker (1 original copy) | ●Owner/Applicant/Contractor. |
| 11 | ✓Insulation Test/Megger Test with Certificate of Calibration of the Equipment used (1 original copy) | ●Owner/Applicant/Contractor. |
| 12 | ✓Authorization letter for Representative, with attached photocopy of ID of both the owner and the representative (1 original copy) | ●Owner/Applicant/Contractor. |
| 13 | ✓ Picture of Building / Structure, Service Entrance and Panel Board | ●Owner/Applicant/Contractor. |
| 14 | ✓FOR EXISTING BUILDING/STRUCTURE OR UNIT | ●Below |
| 15 | ✓Certificate of Final Electrical Inspection application form with sketch of location (3 original copy) | ●Owner/Applicant/Contractor. |
| 16 | ✓Yellow Card from NEECO (1 original copy) | ●NEECO Business Center |
| 17 | ✓TCT/Lot Award / NHA Clearance as proof of ownership (1 photocopy) | ●Owner/Applicant/Contractor. |
| 18 | ✓Tax Declaration of Land and Building (1 original copy) | ●Owner/Applicant/Contractor. |
| 19 | ✓Latest Tax Receipt and Tax Clearance for Land and Building (1 original copy) | ●Owner/Applicant/Contractor. |
| 20 | ✓ Previously approved Building Permit / Occupancy Permit of the existing building / structure (1 original copy) (for verification purposes only) | ●Owner/Applicant/Contractor. |
| 21 | ✓ Electrical Plan / Electrical Load Schedule (1 set, signed and sealed by a Professional Electrical Engineer) | ●Owner/Applicant/Contractor. |
| 22 | ✓ Electrical Plan and Permit for Commercial / Industrial establishment (1 set, signed and sealed by a Professional Electrical Engineer) | ●Owner/Applicant/Contractor. |
| 23 | ✓ Business Permit for Commercial / Industrial establishment (1 photocopy) | ●Business Permit and Licensing Office |
| 24 | ✓ Fire Safety Inspection Certificate for Business – for Commercial / Industrial establishment (OBO copy) | ●Municipal Fire Station |
| 25 | ✓ Barangay Clearance for CFEI application purposes. | ●From Barangay Hall where the house / building / structure is located. |
| 26 | ✓ Picture of Building / Structure, Service Entrance and Panel Board | ●Owner/Applicant/Contractor. |
| 27 | ✓ADDITIONAL REQUIREMENTS IN CASE THE APPLICANT IS NOT THE LAWFUL OWNER OF THE PROPERTY, WHICHEVER IS APPLICABLE | ●Below |
| 28 | ✓Contract of Lease / Affidavit of Consent (1 original copy, signed by the property owner or all of the immediate Heirs of the Property Owner and notarized) | ●Owner/Applicant/Contractor. |
| 29 | ✓ Extra Judicial Settlement (1 original copy, notarized) | ●Owner/Applicant/Contractor. |
| 30 | ✓ One (1) copy of duly notarized Deed of Absolute Sale | ●Owner/Applicant/Contractor. |
| 31 | ✓ One (1) copy of duly notarized Deed of Donation | ●Owner/Applicant/Contractor. |
| 32 | ✓ One (1) copy of Duly Notarized Special Power of Attorney signed by the Property Owner. | ●Owner/Applicant/Contractor. |
| 33 | ✓ Grant of Right-of-way | ●NEECO Business Center |
| 34 | ✓ Authorization to process Certificate of Electrical Inspection, with photocopy of ID of both the Owner and the Representative. | ●Owner/Applicant/Contractor. |
| 35 | ✓CERTIFICATE OF ELECTRICAL INSPECTION (CEI) REQUIREMENTS FOR TELECOMMUNICATIONS | ●Below |
| 36 | ✓ Certificate of Final Electrical Inspection application form with sketch of location (1 original copy) | ●Owner/Applicant/Contractor. |
| 37 | ✓ Yellow Card from NEECO | ●NEECO Business Center |
| 38 | ✓ TCT / Lot Award / NHA Clearance – for proof of ownership (1 photocopy) | ●Owner/Applicant/Contractor. |
| 39 | ✓ Tax Declaration of Land and Building (1 photocopy) | ●Owner/Applicant/Contractor. |
| 40 | ✓ Latest Tax Receipt / Tax Clearance for Land and Building (1 photocopy) | ●Owner/Applicant/Contractor. |
| 41 | ✓ Contract of Lease (1 photocopy) | ●Owner/Applicant/Contractor. |
| 42 | ✓ Excavation Permit for Pole Installation (1 photocopy) | ●Owner/Applicant/Contractor. |
| 43 | ✓ Third-Party Marketing Organization Clearance | ●Owner/Applicant/Contractor. |
| 44 | ✓ Clearance from Engineering Department | ●Municipal Engineering Office |
| 45 | ✓ Approved Electrical Permit for Cell Site / Antenna | ●Owner/Applicant/Contractor. |
| 46 | ✓ Approved Electronics Permit for Cell Site / Antenna | ●Owner/Applicant/Contractor. |
| 47 | ✓ Certificate of Use | ●Owner/Applicant/Contractor. |
| 48 | ✓ Picture of Building / Structure, Service Entrance and Panel Board | ●Owner/Applicant/Contractor. |
| 49 | ✓ Authorization to process CEI, with photocopy of ID of both owner and representative. | ●Owner/Applicant/Contractor. |
3 STEPS
|
CLIENT STEPS |
AGENCY ACTION |
FEES TO BE PAID |
PROCESSING TIME |
PERSON RESPONSIBLE |
|
1.1 Receive and verify the completeness of application documents in accordance with the provided checklist of requirements.
1.2 Encode received application and documents and endorsed to assigned CFEI inspectors for schedule of inspection.
1.3 Inspect location of project site; Prepare inspection report; and Evaluate documents for compliance.
1.4 Final Evaluation of submitted requirements, if found complete and compliant prepare assessment of permit fees.
1.5 Prepare Order of Payment.
1.6 Sign and approve Order of Payment. |
None
None
None
None
Refer to NBC (PD1096) prescribed Schedule of Fees
None |
30 minutes
10 minutes
2 days
6 hours
10 minutes
30 minutes
|
Engr. Ralph Jayson A. Loto Regino John S. Salamanca Engineering Office
Engr. Ralph Jayson A. Loto Regino John S. Salamanca Engineering Office
Engr. Marlyn L. Laureta Engr. Ralph Jayson A. Loto Regino John S. Salamanca Engineering Office
Engr. Marlyn L. Laureta Engr. Ralph Jayson A. Loto Regino John S. Salamanca Engineering Office
Engr. Ralph Jayson A. Loto Engineering Office
Engr. Marlyn L. Laureta Engr. Ralph Jayson A. Loto Engineering Office |
|
2.1 Check and Record O.R. No.; Assign Wiring Permit number; and Prepare CFEI
2.2 Approved and Signed Certificate of Final Electrical Inspection |
None
None |
20 minutes
10 minutes |
Engr. Ralph Jayson A. Loto Engineering Office
Engr. Marlyn L. Laureta Engr. Ralph Jayson A. Loto Engineering Office |
|
3. Issue copy of Wiring Permit. |
None |
10 minutes |
Engr. Marlyn L. Laureta Engr. Ralph Jayson A. Loto Engineering Office |
|
|
TOTAL |
Refer to NBC (PD1096) prescribed Schedule of Fees |
3 DAYS
|
|